Interior Project Timeline: What to Approve and When

พื้นที่นั่งเล่น Theera House มองตามแนวหน้าต่างไปยังโต๊ะกินข้าวด้านใน / Theera House living area looking along the glazing towards the dining table

Plan an interior project timeline around the decisions each next step needs. Agree on the scope and furniture layout first, then coordinate lighting, power, plumbing, air conditioning and cabinetry. Review the drawings, priced scope and finish samples before authorising orders or fabrication. Confirm installation and handover dates against production, site readiness and access.

An interior project has decision deadlines as well as dates for work on site. If the kitchen island drawings depend on an appliance model, choosing the model has a decision deadline. Fitting the island has an installation date. Record both and list the information still outstanding so the team can see what can continue if an approval is late.

Map the approvals before setting a start date

  1. Scope and brief. Agree which rooms are included, what you will keep, who uses each room and which changes matter most. The team can survey the space and log access constraints before defining the scope of design and pricing.
  2. Furniture layout. The designer develops options based on room sizes and routines. Check the main furniture positions, routes through rooms and the space needed to use doors, drawers and seating. Approve a dated layout for the team to use when coordinating services.
  3. Details and services. The designer coordinates with the people responsible for electrical, plumbing, air conditioning and cabinetry. Confirm equipment models and scope decisions that affect the drawings. Review changes using the latest drawing set.
  4. Pricing, materials and fabrication. Compare the contractors priced scope and bill of quantities (BOQ) with the drawings and check inclusions and exclusions. Approve physical samples. Have the fabrication team confirm site dimensions and the applicable shop drawings before releasing the work.
  5. Installation and handover. Agree when the space will be ready, sequence related trades and book inspections as agreed. Use the latest drawings and a written list of outstanding items at handover.
Low seating by the glazing and a long display wall at Theera House
Theera House. Consider seating and storage routines when setting the scope for each room.

Explore the shared rooms and activity spaces in the Theera House project. The photographs show the completed home. The island change below is a hypothetical example.

Adapt the sequence to the scope of your home. If you need to buy something while design is still under way, record what the purchase depends on and who will handle a change. The sequence draws on the RIBA Plan of Work. The projects service agreement and contract define who does what, which documents are required and when approvals are due.

Approve a layout the team can coordinate from

Walk through a routine on the plan. In a dining room, for example, trace the route from setting the table to getting up and walking to the door. Mark the table, chairs, storage and any items you will keep. If an items dimensions are still pending, note the working dimensions and assign someone to provide the actual size before the designer develops dependent details.

Long dining table parallel to the glazing at Theera House
Theera House. Read the table position together with the chairs and routes around it.

Put a revision number and date on the layout approval. When furniture moves, ask the team to check the ceiling plan, elevations and socket locations that may be affected. The guide to reading interior construction drawings uses IDEO Q36 to show how the different sheets relate.

What changes if you move the kitchen island?

Suppose you want to move the island to make more space beside the table. First, the designer checks whether cabinet doors and chairs work in the revised layout. If the island has a socket or sink, have the relevant trades check power and pipe routes. If there is a pendant above, check the ceiling and light position too. Then ask the contractor what this changes in the priced, ordered or fabricated work.

Kitchen island and wall cabinetry at Theera House
The completed Theera House kitchen shows the island in relation to the surrounding cabinets.

Before you approve the change, ask for the list of drawings to revise, any price difference and the earliest date the affected work can resume. Work in other rooms may continue if it uses the existing drawings and shares no affected services. Have the contractor state which work can proceed and which items depend on your decision.

Check drawings and samples before releasing fabrication

Compare the finish sample with adjoining materials in the rooms light. Where cabinetry meets stairs, an existing wall or the ceiling, confirm which dimensions the team must measure on site and which drawing goes to the fabricator. Approving the appearance and approving the fabrication dimensions can happen on different days.

Stair and adjoining vertical wall panels at Theera House
Theera House. The stair and wall junction illustrates where verified site dimensions matter.

What to include in an approval by chat or email

  • The item, room and drawing revision or sample code.
  • Who supplies the information, who approves it and when the next team needs a reply.
  • Which items are approved, which are pending and which work can start now.
  • What a later change could affect in the drawings, cost and schedule.

Example approval. Island position approved on layout revision 03 for electrical and ceiling coordination. Fabrication is pending a check of the service connections and site dimensions. Please issue the next elevation for review.

Schedule installation and handover around site readiness

Before booking installation, confirm that the space is ready to measure and fit, when the parts will arrive and which trades need to finish first. For a condo, ask building management directly about work hours, delivery access and required paperwork. At handover, keep the outstanding items, responsible people and reinspection dates together. See the interior handover checklist for items to inspect.

Theera House bedroom with a raised bed platform, adjacent cabinetry and lighting at the platform edge
Theera House. At handover, test cabinetry and lighting where they are installed.

Frequently asked questions

Should I buy furniture before design starts?

If you already intend to keep an item, share its dimensions and a photo early. Before paying for a new piece, check its fit on the plan, delivery route and delivery terms. This matters especially when the piece determines the positions of nearby cabinetry or services.

Can I release cabinetry for fabrication after approving the 3D views?

Use 3D views to agree on the appearance. Before releasing cabinetry, review the shop drawings, actual dimensions, equipment models, openings and approved finishes with the people responsible for the work.

What if my move-in date is already fixed?

Tell the team your move-in date and which rooms must be usable. Work backwards through installation, inspection and rectification, checking production, deliveries and site access. If the date is hard to move, ask early whether the team can hand over rooms in phases.

Plan your project with Penthouse Design Group

Send a plan or photos, the rooms you want to change, items you intend to keep, an approximate budget and your preferred move-in period. We can use these to discuss scope and the approvals your project will need. Share your project details or review our interior design services and current design fees and pricing terms.